# How to create a Sleepover Shift in Schedule Board

Source: https://help.provisoft.com.au/rostering/how-to-create-asleepover-shift-in-schedule-board

A **Sleepover Shift** is a type of shift where the support worker stays overnight at a participant’s location but is **not actively working the entire time**. Instead, they are generally **asleep or on-call** and only provide assistance if needed during the night.

This guide explains how to create various types of **Sleepover Shifts** in the Schedule Board module. We will learn about :

1. Which service items allow for sleepover shifts
2. How to create a Sleepover only Shift
3. How to create a Sleepover with leading Shift
4. How to create a Sleepover with a trailing Shift
 

#### **Which Service items allow for Sleepover shifts**

Sleepover Shifts can only be created if the Service Item allows for it.

If the Service Item Sleepover flag =&gt; Yes &amp; Enabled

![](https://cdn.eniston.com/bases/12149a1e-af46-4dbd-8e57-28c5a2faf1f6/attachments/mceclip1_1744455613.png)

#### **Create a Sleepover only Shift** 

**![](https://cdn.eniston.com/bases/12149a1e-af46-4dbd-8e57-28c5a2faf1f6/attachments/mceclip3_1744456033.png)**

To create a Sleepover only shift:

 

1. Fill in all the details as the normal Shift.
2. Check the Sleepover Checkbox. And Choose the Shift Type **No Leading/Trailing Shift** from Dropdown   
    ![](https://cdn.eniston.com/bases/12149a1e-af46-4dbd-8e57-28c5a2faf1f6/attachments/mceclip4_1744456231.png)
3. Now, enter the Sleepover Start Time and Sleepover End Time. Sleepover must be of minimum 8 hour.  
    ![](https://cdn.eniston.com/bases/12149a1e-af46-4dbd-8e57-28c5a2faf1f6/attachments/mceclip5_1744457550.png)
4. Then, Click on the Submit Button to finalize the Sleepover Shift Creation.
 

#### **Create a Sleepover with leading Shift**

A Sleepover with Leading Shift is when a support worker performs an active shift *before* the sleepover period begins.

**Example :**

- **4:00 PM – 10:00 PM** → Active shift
- **10:00 PM – 6:00 AM** → Sleepover shift
 

So the worker starts with regular duties, then transitions into a sleepover.

**To Create a Sleepover with leading Shift**

1. Fill in all the details as Normal Shifts.
2. Check the Sleepover Checkbox. And Choose the Shift Type **Leading Shift** from Dropdown.  
    ![](https://cdn.eniston.com/bases/12149a1e-af46-4dbd-8e57-28c5a2faf1f6/attachments/mceclip7_1744458393.png)
3. Now, enter the Start Time, Sleepover Start Time and Sleepover End Time.  
    ![](https://cdn.eniston.com/bases/12149a1e-af46-4dbd-8e57-28c5a2faf1f6/attachments/mceclip8_1744458790.png)In this case, the **Shift starts at 6:00 PM** and **ends at 10:00 PM**, followed by a **Sleepover from 10:00 PM to 6:00 AM** the next morning.   
    
    In your system, a **Sleepover with Leading Shift** is created using three key fields:
    
    
    - **Start Time** → When the active (leading) shift begins
    - **Sleepover Start Time** → When the sleepover period begins
    - **Sleepover End Time** → When the sleepover ends (usually the next morning)
     
    
    
    Important Concept:
    
    
    1. When the **Sleepover Start Time begins, the active shift ends.  
        There is **no overlap** between the active shift and the sleepover period.**
4. Then, Click on the Submit Button to finalize the Sleepover with leading Shift Creation.
 

#### **Create a Sleepover with leading Shift**

A Sleepover with Trailing Shift is when a support worker stays overnight for a sleepover shift, and then continues into an active (working) shift in the morning.

### Example:

- **10:00 PM – 6:00 AM** → Sleepover
- **6:00 AM – 9:00 AM** → Active shift
 

The sleepover ends and is **immediately followed** by an active.

**To Create a Sleepover with leading Shift**

1. Fill in all the details as Normal Shifts.
2. Check the Sleepover Checkbox. And Choose the Shift Type **Leading Shift** from Dropdown.  
    ![](https://cdn.eniston.com/bases/12149a1e-af46-4dbd-8e57-28c5a2faf1f6/attachments/mceclip9_1744459617.png)
3. Now, enter the Sleepover Start Time ,Start Time and End Time.  
    ![](https://cdn.eniston.com/bases/12149a1e-af46-4dbd-8e57-28c5a2faf1f6/attachments/mceclip10_1744459725.png)  
    In this Case the Sleepover starts at 22:00 to 06:00 followed by the shift from 06:00 to 10:00.  
    Here Shift **Start Time** is Considered as the **Sleepover End Time**.
4. Now Assign a employee and Click on the Submit Button to finalize the Sleepover with the trailing Shift.
